Facility Management Tender Proposal: What to Include

14 November 2026 · 8 min read · By NextBid Bid Experts

A facility management tender proposal turns the booklet's scope into a service matrix, a shift model, response times, a maintenance schedule and a mobilization plan. Here is what to show.


A facility management (FM) tender proposal is the technical offer in which a bidder shows how it will run, maintain and clean a building or estate for the contract term: which services it covers, who staffs them, how quickly it responds and how it measures its own performance. The committee scores it against the criteria in the tender booklet, so every commitment you write should map to a booklet clause and to a resource you have priced.

This guide covers the facility-management detail. For the general frame of an operation and maintenance bid, read Operation and Maintenance Tender Proposal: What to Show first.

What does an FM technical proposal have to show?

The booklet sets the evaluation criteria, their weights and the minimum technical score; the committee applies what it states. Under the Government Tenders and Procurement Law, when offers come in two files, the technical offer is examined first, a technical offer that is not acceptable is excluded, and its financial offer is returned unopened. So the technical offer is the gate before price is read.

For operation and maintenance tenders, the current evaluation-criteria controls (2021) fix a mandatory technical weight of 20% to 50% at or above the high-value level and 20% to 40% for routine work below it, and 50% to 70% for specialised work at or above it. Check which category the booklet gives your tender and what exact weights it states; this is not a national pass mark.

Build the proposal in the order the evaluation table scores it. The compliance matrix is the tool that ties each requirement to the page that answers it.

How do you build the service scope matrix?

Split the scope into hard services (the building's engineered systems) and soft services (people-based services), then give each line the same four facts: what is covered, how often, to what standard and who is responsible. Use the booklet's own wording for frequencies and standards.

Service areaTypeWhat the matrix states
Electrical, HVAC and plumbingHardAssets covered, preventive visit intervals and the corrective-repair standard the booklet sets
Fire and life safety, liftsHardInspection and testing cycles, the certified or licensed party where the booklet requires one, and what is reported to the entity
Cleaning and hygieneSoftAreas, frequency by area type, consumables supplied and the inspection method
Security and receptionSoftPosts, hours, post orders and reporting lines
Landscaping, pest control and wasteSoftVisit schedule, treatment or collection points and the records kept
Helpdesk and reportingSupportContact hours, how requests are logged and closed, and the monthly report

How do you present the staffing and shift model?

Show the roster, not just the headcount, so the committee can test whether the promised service levels can be delivered.

  • A shift plan for each site and service line, with the hours covered and the role on duty in each shift.
  • Supervision lines: who supervises each team and who answers to the entity's representative.
  • Cover for leave, sickness and turnover, so a response time does not depend on one named person.
  • Any minimum staffing, qualifications or experience the booklet requires, restated exactly, with CVs attached for key roles (see Key Personnel CVs in a Technical Proposal).
  • Any Saudization or local-content requirement the booklet states, answered with the plan you can deliver and no figure the booklet does not ask for.

Your financial offer must carry the same roster. A shift model that the price does not cover is a commitment you cannot keep; the cost build-up is explained in Manpower Contract Pricing in Saudi Arabia.

How do you show response times, planned maintenance and the asset register?

  • Response and resolution times: restate the priority levels and times the booklet defines, then show the helpdesk, roster and spares that meet each one. If the booklet gives no times, ask in the inquiry window before you invent them.
  • Planned preventive maintenance: an annual schedule by asset class, showing visit intervals, the team responsible and how completion is recorded.
  • Asset register: if the booklet supplies an asset list, plan and price against it; if it does not, state how you will survey, tag and record assets during mobilization and how the register stays current.
  • Helpdesk and maintenance-management system: describe how a request is logged, assigned, closed and reported, and which records the entity can see.
  • Reporting: the monthly report content, tied to the performance indicators in the booklet.

How do you handle KPIs, mobilization and subcontractors?

If the booklet links payment or deductions to performance indicators, copy each indicator into the proposal with the way you will measure it, the record you will keep and the person who owns it.

For mobilization, give a dated plan for the period before full service: handover and site survey, asset tagging, staff onboarding, access and permits, and the first reporting cycle. The detail of schedule writing is in Work Plan and Schedule in a Technical Proposal.

If you plan to use specialist subcontractors, for example for lifts or fire systems, name them and the scope. Under the current law, subcontracting needs the entity's written approval and the contractor stays jointly liable with the subcontractor. The current Implementing Regulations limit subcontracted works to 30% of the contract amount; a share between 30% and 50% needs prior consent from the entity and the spending-efficiency body, and more than one subcontractor. The new law, which takes effect in early January 2027, keeps written approval and joint liability and leaves the cap to its Implementing Regulations, so check the tender booklet.

What do delay-fine caps mean for the way you write?

Under the current law, the delay fine is capped at 6% of the value of a supply contract and 20% of the value of other contracts. An entity can raise those percentages only with the Minister's prior approval and only if it tells bidders before they submit. For a continuing service that falls short, the current law caps the fine at 20% of the contract value and also deducts the value of the work not performed.

The new law, which takes effect in early January 2027, changes the cap for other contracts to 15% and the continuing-service cap to 15%, and keeps 6% for supply. A tender offered before the new law takes effect stays under the current law unless the Minister of Finance decides to apply some of the new rules to it, so check that tender's booklet and announcements.

For the proposal, the lesson is practical: write only response and quality commitments your roster and price can sustain, because a service shortfall carries a fine and a deduction.

Every number in an FM proposal should trace to a booklet clause: restate the required response times and indicators exactly, then show the roster, schedule and records that deliver them.

Frequently asked questions

What is the difference between hard and soft services in an FM tender?

Hard services maintain the building's engineered systems, such as electrical, air conditioning, plumbing, fire protection and lifts. Soft services are people-based, such as cleaning, security, landscaping and reception. The booklet's scope shows which of them your tender includes.

Should I offer shorter response times than the booklet requires?

Meet the booklet's times in full first. Offer shorter ones only if the booklet invites alternatives and your roster and price support them, because you will have to deliver whatever you write.

Do I need to include an asset register in the proposal?

If the booklet provides an asset list, plan and price against it. If it does not, explain how you will survey and record assets during mobilization, and raise missing information as a question in the inquiry window.

Can I subcontract part of the FM scope?

Under the current law, yes with the entity's written approval, and you remain jointly liable. The current Implementing Regulations limit subcontracted works to 30% of the contract amount, with a share between 30% and 50% needing prior consents. The new law, which takes effect in early January 2027, keeps written approval and joint liability and leaves the cap to its Implementing Regulations, so check the tender booklet.

How much can an entity fine for delay or service shortfall?

Under the current law, the delay fine is capped at 6% for supply and 20% for other contracts, and a continuing-service shortfall at 20% plus a deduction for work not performed. The new law, which takes effect in early January 2027, changes the other-contract and continuing-service caps to 15%. The booklet states which applies to your tender.

Our bid management team works from the booklet clause by clause: the bid and RFP writing service covers technical and commercial proposals written natively in Arabic and English. If a proposal we prepared is technically disqualified because of our work, the next proposal is free.

Related Insights

Explore more practical ideas to improve your bid win rate.

Technical Proposals

Construction Tender Technical Proposal: What to Include

What a construction tender technical proposal contains: method statements, site organisation, equipment, manpower, schedule, quality and HSE plans, and subcontractors.

Read article →

Technical Proposals

Quality Plan in a Technical Proposal: What to Include

A quality plan scores when it shows who controls quality, what is inspected and how defects are closed on this contract. Here is what to include and how to avoid boilerplate.

Read article →

Technical Proposals

Cybersecurity Tender Proposal in Saudi Arabia: NCA Guide

In cybersecurity tenders the technical offer is judged on NCA alignment, staffing, SOC location and measurable service levels. Here is how to write a proposal that shows each one clearly.

Read article →