HSE Plan Tender: What to Include in Your Proposal
23 November 2026 · 7 min read · By NextBid Bid Experts
An HSE plan shows how you will protect people, property and the environment while you deliver the contract. Here is what to include for construction, O&M and FM bids, and which Saudi rules to check.
An HSE plan (Health, Safety and Environment plan) is the section of a technical proposal that shows how you will protect people, property and the environment while you deliver the contract. For construction, operation and maintenance (O&M) and facilities management (FM) bids, it should name the hazards of the actual work, the controls you will apply, who is responsible for each control, and how incidents are reported and handled. Whether the plan is scored, set as a pass/fail requirement or requested in another form is decided by the tender booklet (كراسة الشروط والمواصفات), so read its technical evaluation criteria first.
Where does the HSE plan fit in the technical offer?
The booklet lists the technical documents the entity wants and how they are evaluated; the HSE plan is one of them only if the booklet, the scope of work or the conditions call for it. Read those three places together. Our guide to Etimad technical proposal requirements shows how to read what the booklet asks for.
If the entity attaches its own site safety rules, refer to them by name in your plan and say how you will comply. If the booklet sets a page limit or a format, follow it. If anything about HSE is unclear, ask in the inquiry period rather than guess.
What should an HSE plan contain?
Adapt the depth of each element below to the scope and to what the booklet asks for.
| Section | What to write |
|---|---|
| HSE policy and commitment | A short policy statement from senior management with objectives and the person accountable for meeting them. |
| Organisation and responsibilities | Named roles (HSE manager or officer, supervisors, workers), their authority to stop unsafe work, and where they sit in the project organisation chart. |
| Risk assessment | The hazards of each activity in your scope, who could be harmed, how serious the risk is, and the control for each. |
| Controls for higher-risk activities | Safe arrangements for the activities in your scope, for example work at height, lifting, excavation, electrical isolation, hot work and confined spaces, with permits to work where needed. |
| Protective equipment | The protective equipment issued for each task, provided at no cost to workers, and how it is inspected and replaced. |
| Training and induction | Induction before work starts, task briefings, regular safety talks and the records you keep. |
| Incident and near-miss reporting | How incidents and near misses are reported, investigated and corrected, who is told (the client and any authority the booklet or the law names), and how records are kept. |
| Emergency response | Fire prevention and firefighting, first aid, evacuation routes, emergency contacts, drills and the route to the nearest medical facility. |
| Environmental controls | Waste, spills, dust, noise, and water and energy use, plus any environmental requirement written in the booklet. |
| Subcontractor HSE | How your requirements pass to subcontractors, the checks before they start work and how you supervise them. |
| Monitoring and review | Inspection schedule, audits, corrective actions and the measures you will report to the client. |
Which Saudi rules should the plan refer to?
State only requirements you have checked at the source. These are the sources to check.
- The safety chapter of the Saudi Labor Law, as published by the Ministry of Human Resources and Social Development (HRSD). It requires the employer to keep the workplace healthy and clean, with adequate lighting and drinking and washing water, and to take precautions against work hazards, diseases and machinery risks.
- Information, equipment and training: the same chapter requires the employer to post safety instructions where they are visible, in Arabic and, where needed, in languages the workers understand, and not to charge workers for this protection. Before work begins the employer must tell workers about the hazards of the job, require them to use the prescribed protective equipment, supply suitable equipment and train them to use it.
- Fire, first aid and health: the Labor Law requires fire prevention measures, firefighting equipment and escape routes kept usable at all times, first-aid kits, and a medical examination at least once a year for workers exposed to occupational disease risks.
- The summer midday decision: HRSD's decision for 2026 banned work under direct sunlight from 15 June to 15 September, from 12:00 to 15:00, for private-sector establishments. HRSD's notice also tells employers to provide drinking water, suitable rest areas, shaded areas and personal protective equipment, to raise awareness of heat stress and to monitor workers' condition. Check the decision in force when you will work, and show the arrangement in your schedule and plan.
- The booklet and the entity: any HSE requirement in the booklet, the scope of work or the entity's site rules. If the booklet refers to a requirement of a competent authority for your activity, read that source directly, and ask in the inquiry period if the reference is unclear.
How does the HSE plan change by contract type?
| Contract type | Where the plan should be specific |
|---|---|
| Construction | The sequence of site activities from your method statements: excavation, work at height, lifting, temporary works, site traffic and the summer working pattern. |
| Operation and maintenance | Work on live equipment and operating assets: isolation before maintenance, permit to work, call-outs outside normal hours and working alongside the entity's own staff. |
| Facilities management | Occupied buildings: protecting occupants and visitors, cleaning and pest-control chemicals, work at height for lighting and facades, and waste handling. |
For the full proposal structure, see construction tender proposals and method statements and facility management tender proposals.
How do you make the HSE plan specific to this tender?
- Write for this contract. Name the site, the activities and the entity's rules, and remove any paragraph that could sit unchanged in another bid.
- Tie it to your work plan and your risk management section: each higher-risk activity should appear in all three with the same control.
- Give every control an owner by role, and show those roles in the project organisation chart.
- Show the summer arrangement in the schedule and in the plan, in line with the decision in force.
- Cover subcontractors in the same plan, not in a separate promise.
- Price it. Protective equipment, training, signage and first-aid supplies are real costs. Place them in your rates consistently with the plan, and do not add or change lines in the bill of quantities, because bidders may not alter it.
An HSE plan reads as credible when it is specific to the contract: the real hazards of the real scope, a named owner for each control, and rules checked at the source, namely the booklet, the safety chapter of the Saudi Labor Law and the HRSD summer decision.
Frequently asked questions
Who decides whether a tender needs an HSE plan?
The tender booklet and its scope of work decide. Read the technical requirements, the evaluation criteria and the conditions together. If it is not clear whether a separate plan is expected, ask in the inquiry period.
How long should an HSE plan be?
If the booklet sets a page limit or a format, follow it. Without a limit, let the scope set the length: enough to cover each element above for the activities you will actually perform.
Does the summer midday work ban affect my schedule?
Yes, if your workers will be outdoors in the months the decision covers. The 2026 decision from HRSD ran from 15 June to 15 September, from 12:00 to 15:00, for private-sector establishments. Check the decision in force when you will work, and show the arrangement in your schedule and your plan.
Where do HSE costs go in the financial offer?
Price them in your rates in a way that matches your plan. Do not add or alter lines in the bill of quantities, because bidders may not change it. If the bill has an HSE line, price that line as issued.
Can I reuse the same HSE plan for every bid?
Yes for the policy and your standard procedures, no for the site-specific parts. The risk assessment, the organisation, the emergency arrangements and the subcontractor controls should be rewritten for each contract.